Construction Bid Calculator
Price a construction job or bid — materials, burdened labor, equipment, subs, contingency, overhead and profit — with gross margin and markup.
Price a construction job or bid — materials, burdened labor, equipment, subs, contingency, overhead and profit — with gross margin and markup.
Results
About This Calculator
Enter direct costs, then contingency, overhead and profit percentages. Works for general bids, job pricing and estimating any trade.
Example
Example: $41,860 of direct cost (including $14,560 of burdened labor) with 5% contingency, 12% overhead and 10% profit gives a bid of $54,150.10 — a 22.7% margin.
Assumptions
Contingency is applied to direct cost; overhead to direct + contingency; profit to total cost. Margin = (bid − direct) ÷ bid. Results are planning estimates — prices vary by region and supplier, and structural, fire and life-safety work must be designed and checked by a licensed professional to local code.
Frequently Asked Questions
What's the difference between markup and margin?
Markup is a percentage of cost; margin is a percentage of the selling price — a 25% markup is a 20% margin.
What overhead and profit should a contractor charge?
Commonly 10–20% overhead and 5–15% profit, depending on trade and risk.