Load Bank Test Calculator
Plan a generator load bank test — recommended load bank size, kW and kVA at 25/50/75/100% steps, current at your voltage, NFPA 110 minimum and…
Plan a generator load bank test — recommended load bank size, kW and kVA at 25/50/75/100% steps, current at your voltage, NFPA 110 minimum and diesel used.
Results
About This Calculator
Enter the generator's kW rating, voltage and phase, and how long the stepped test will run.
Example
Example: a 500 kW, 480 V generator needs a 500 kW load bank; at full load it draws 601.41 A, and a 4-hour stepped test burns about 105.75 gal of diesel.
Assumptions
Equal time at each step; diesel use ≈ kW × (0.016 + 0.059 × load) gal/h. NFPA 110 requires monthly exercise at ≥30% load or an annual load bank test if that isn't met. Results are engineering and budgeting estimates — electrical work must follow the NEC and local code and be designed or checked by a licensed professional, and energy prices and incentives change.
Frequently Asked Questions
Why load bank test a generator?
To prove it can carry full load and burn off wet stacking (unburned fuel) from running lightly loaded.