Load Bank Test Calculator

Plan a generator load bank test — recommended load bank size, kW and kVA at 25/50/75/100% steps, current at your voltage, NFPA 110 minimum and…

Results

Enter your details and click Calculate to see your results.
About This Calculator

Enter the generator's kW rating, voltage and phase, and how long the stepped test will run.

Example

Example: a 500 kW, 480 V generator needs a 500 kW load bank; at full load it draws 601.41 A, and a 4-hour stepped test burns about 105.75 gal of diesel.

Assumptions

Equal time at each step; diesel use ≈ kW × (0.016 + 0.059 × load) gal/h. NFPA 110 requires monthly exercise at ≥30% load or an annual load bank test if that isn't met. Results are engineering and budgeting estimates — electrical work must follow the NEC and local code and be designed or checked by a licensed professional, and energy prices and incentives change.

Frequently Asked Questions

Why load bank test a generator?

To prove it can carry full load and burn off wet stacking (unburned fuel) from running lightly loaded.

Related Calculators

About the Author

Imran Hossain
Imran Hossain

Professional SEO, Digital Marketer Specialist

I am a Certified Google Ads Expert And Professional SEO, Digital Marketing Specialist

View full profile