EVM Calculator
Calculate earned value management (EVM) metrics for a project — planned value, earned value, cost and schedule variance, CPI, SPI, EAC, ETC, VAC and TCPI.
Calculate earned value management (EVM) metrics for a project — planned value, earned value, cost and schedule variance, CPI, SPI, EAC, ETC, VAC and TCPI.
Results
About This Calculator
Enter the total budget, how much of the work should be done by now according to the plan, how much actually is, and what you've spent. CPI and SPI below 1 mean over budget and behind schedule.
Example
Example: a $500,000 project that should be 50% done is 40% done after spending $220,000. EV = $200,000, so CPI = 0.91 and SPI = 0.80. At this efficiency it will cost $550,000 — $50,000 over budget.
Assumptions
EAC = BAC ÷ CPI (assumes current cost performance continues); TCPI = (BAC − EV) ÷ (BAC − AC), the efficiency needed on the remaining work to finish on budget. PMI's PMBOK standard formulas.
Frequently Asked Questions
What does a CPI of 0.9 mean?
You're getting 90 cents of planned work for every dollar spent — about 11% over budget.
What is a good SPI?
1.0 is on schedule; above 1 is ahead. Below about 0.9 usually needs corrective action.