Concrete Curing Time Calculator
Estimate when you can walk on, strip forms from, drive on and fully load new concrete — adjusted for air temperature and cement type.
Estimate when you can walk on, strip forms from, drive on and fully load new concrete — adjusted for air temperature and cement type.
Results
About This Calculator
Enter the average temperature expected over the first week and the type of mix you ordered.
Example
Example: at an average of 50 °F standard concrete gains strength at 0.64× the 70 °F rate — wait about 10.89 days before driving on it and 43.54 days for full strength.
Assumptions
Base schedule at 70 °F: walk 24 h, strip forms 2 days, cars 7 days, full strength 28 days. Times are scaled with the Nurse–Saul maturity method (−10 °C datum). Keep concrete moist for at least 7 days; below 40 °F use blankets or heated enclosures. Quantities are estimates — order a little extra and confirm mix, reinforcement and sizing with your supplier or engineer where codes apply.
Frequently Asked Questions
How long before you can drive on new concrete?
About 7 days for cars in mild weather and 28 days for heavy trucks.
Does cold weather slow concrete curing?
Yes — at 50 °F it takes roughly 1.5× as long as at 70 °F, and curing almost stops near freezing.