Floor Screed Calculator (Volume, Sand, Cement & Drying Time)

Calculate floor screed in m³ and tonnes — sand and cement bags for a 1:4 mix or liquid anhydrite — from the floor area and…

Results

Enter your details and click Calculate to see your results.
About This Calculator

Enter the floor area and depth. Bonded screeds can be 25–40 mm, unbonded 50 mm+, and floating screeds over insulation 65–75 mm (traditional) or 35–50 mm (liquid).

Test moisture before laying timber or vinyl floors.

Example

Example: 20 m² of 65 mm sand and cement screed is 1.3 m³ — about 2.16 tonnes of sharp sand and 20 bags of cement — and needs roughly 90 days to dry.

Assumptions

Sand and cement 1:4 ≈ 2.1 t/m³ (dry materials ≈ 1.3 × wet volume); liquid anhydrite ≈ 2.0 t/m³ (ordered ready-mixed). Drying: 1 mm/day up to 40 mm and 0.5 mm/day beyond; fast-drying screeds per the product sheet.

Frequently Asked Questions

How long does a 65 mm screed take to dry?

About 3 months for traditional sand and cement in good conditions.

Related Calculators

About the Author

Imran Hossain
Imran Hossain

Professional SEO, Digital Marketer Specialist

I am a Certified Google Ads Expert And Professional SEO, Digital Marketing Specialist

View full profile