Floor Screed Calculator (Volume, Sand, Cement & Drying Time)
Calculate floor screed in m³ and tonnes — sand and cement bags for a 1:4 mix or liquid anhydrite — from the floor area and…
Calculate floor screed in m³ and tonnes — sand and cement bags for a 1:4 mix or liquid anhydrite — from the floor area and depth, with an estimated drying time.
Results
About This Calculator
Enter the floor area and depth. Bonded screeds can be 25–40 mm, unbonded 50 mm+, and floating screeds over insulation 65–75 mm (traditional) or 35–50 mm (liquid).
Test moisture before laying timber or vinyl floors.
Example
Example: 20 m² of 65 mm sand and cement screed is 1.3 m³ — about 2.16 tonnes of sharp sand and 20 bags of cement — and needs roughly 90 days to dry.
Assumptions
Sand and cement 1:4 ≈ 2.1 t/m³ (dry materials ≈ 1.3 × wet volume); liquid anhydrite ≈ 2.0 t/m³ (ordered ready-mixed). Drying: 1 mm/day up to 40 mm and 0.5 mm/day beyond; fast-drying screeds per the product sheet.
Frequently Asked Questions
How long does a 65 mm screed take to dry?
About 3 months for traditional sand and cement in good conditions.