Playground Mulch Calculator (Rubber Mulch & Wood Chips)

Calculate playground surfacing — engineered wood fiber, wood chips, rubber mulch, pea gravel or sand — in cubic yards, bags and tons at the CPSC-recommended…

Results

Enter your details and click Calculate to see your results.
About This Calculator

The use zone extends at least 6 ft beyond the equipment on every side. Loose-fill surfaces compress — install 12 in of wood fiber or chips so it stays at least 9 in deep, and rake it back under swings and slides.

Example

Example: a 30 × 20 ft play area with engineered wood fiber at 12 in needs about 22.22 cu yd.

Assumptions

CPSC Public Playground Safety Handbook: 12 in initial depth for wood chips and engineered wood fiber, 6 in for shredded rubber; sand and pea gravel are not recommended for fall heights over about 4–5 ft. Bag sizes: wood 2 cu ft, rubber 0.8 cu ft, gravel/sand 0.5 cu ft.

Frequently Asked Questions

How deep should playground mulch be?

12 in of wood fiber or chips (maintained at 9 in), or 6 in of rubber mulch.

Related Calculators

About the Author

Imran Hossain
Imran Hossain

Professional SEO, Digital Marketer Specialist

I am a Certified Google Ads Expert And Professional SEO, Digital Marketing Specialist

View full profile